Conceptual, Basic and Detailed Project of Tailings Filtering for the treatment of tailings from Concentrator 3, located in the city of Mariana - MG. The completion of this project will allow Samarco to resume its productive operation.
Conceptual and Basic Project of a new plant for the treatment of Itabirites 10 Mtpy. This plant, located in the city of Congonhas - MG, in addition to processing the itabirite ore from the Casa de Pedra mine of CSN, also includes a Tailings Filtration unit.
Beneficiation Plant – 26 mtpy (7 mtpy sinter feed and 19 Mtpy pellet feed) – Conceptual / Basic / Detailed Engineering developed by ECM. Project implemented using Project Automation technology (3D).
Beneficiation Plant – 19.2 Mtpy – Conceptual / Basic / Detailed Engineering developed by ECM. Project implemented using Project Automation technology (3D).
Beneficiation Plant / Pipeline – 26.5 Mtpy – Conceptual, basic and detailed engineering and Procurement.Large scale project for the treatment of lower-grade ores, adopting new technologies and large equipment. The project includes Beneficiation Plant, pipeline and receiving and filtering at Port of Açu – RJ.
Beneficiation Plant – 12 Mtpy – Conceptual / Basic / Detailed Engineering.Project under development with Project Automation Technology (3D). Hiring of services via LTA-Vale contract.